Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/110145| Author(s): | Bushenkov, VA Ferreira, M. M. A. Ribeiro, AF Smirnov, GV |
| Title: | Numerical Approach to a Problem of Hydroelectric Resources Management |
| Issue Date: | 2013 |
| Abstract: | In this paper we consider a simplified model for a system of hydro-electric power stations with reversible turbines. The objective of our work is to obtain the optimal profit of power production satisfying restrictions on the water level in the reservoirs. Two different numerical approaches are applied and compared. These approaches center on global optimization techniques (Chen-Burer algorithm) and on Projection Estimation Refinement method (PER method) used to reduce the dimension of the problem. |
| DOI: | 10.1063/1.4825570 |
| URI: | https://repositorio-aberto.up.pt/handle/10216/110145 |
| Source: | AIP Conference Proceedings |
| Document Type: | Artigo em Livro de Atas de Conferência Internacional |
| Rights: | openAccess |
| Appears in Collections: | FEUP - Artigo em Livro de Atas de Conferência Internacional |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 225964.pdf | This article may be downloaded for personal use only. Any other use requires prior permission of the author and AIP Publishing. The article may be found at at https://doi.org/10.1063/1.4825570 | 241.04 kB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
