Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/110145
Full metadata record
DC FieldValueLanguage
dc.creatorBushenkov, VA
dc.creatorFerreira, M. M. A.
dc.creatorRibeiro, AF
dc.creatorSmirnov, GV
dc.date.accessioned2019-02-07T14:23:01Z-
dc.date.available2019-02-07T14:23:01Z-
dc.date.issued2013
dc.identifier.othersigarra:225964
dc.identifier.urihttps://repositorio-aberto.up.pt/handle/10216/110145-
dc.description.abstractIn this paper we consider a simplified model for a system of hydro-electric power stations with reversible turbines. The objective of our work is to obtain the optimal profit of power production satisfying restrictions on the water level in the reservoirs. Two different numerical approaches are applied and compared. These approaches center on global optimization techniques (Chen-Burer algorithm) and on Projection Estimation Refinement method (PER method) used to reduce the dimension of the problem.
dc.language.isoeng
dc.relation.ispartofAIP Conference Proceedings
dc.rightsopenAccess
dc.titleNumerical Approach to a Problem of Hydroelectric Resources Management
dc.typeArtigo em Livro de Atas de Conferência Internacional
dc.contributor.uportoFaculdade de Engenharia
dc.identifier.doi10.1063/1.4825570
dc.identifier.authenticusP-008-GRE
Appears in Collections:FEUP - Artigo em Livro de Atas de Conferência Internacional

Files in This Item:
File Description SizeFormat 
225964.pdfThis article may be downloaded for personal use only. Any other use requires prior permission of the author and AIP Publishing. The article may be found at at https://doi.org/10.1063/1.4825570241.04 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.