Please use this identifier to cite or link to this item: http://hdl.handle.net/10216/97705
Author(s): António Braga
João Paulo Tomé Saraiva
Title: Dealing with uncertainties in long term transmission expansion planning problems
Issue Date: 2005
Abstract: Transmission expansion planning corresponds to a very relevant issue that should not be forgotten in the scope of the implementation of market mechanisms in the electricity sector. This paper describes a multicriteria model to perform transmission expansion planning exercises that combines probabilistic models to represent the reliability of system components with fuzzy models to incorporate the uncertainty on load evolution along the planning horizon. This formulation also outputs long-term marginal prices that can be used to compute the Marginal Based Remuneration. The paper includes a case study based on the Portuguese 400/220/150 kV transmission network.
Subject: Engenharia electrotécnica, Engenharia electrotécnica, electrónica e informática
Electrical engineering, Electrical engineering, Electronic engineering, Information engineering
Call Number: 67182
URI: http://hdl.handle.net/10216/97705
Source: St. Petersburg Power Tech 2005
Document Type: Artigo em Livro de Atas de Conferência Internacional
Rights: restrictedAccess
Appears in Collections:FEUP - Artigo em Livro de Atas de Conferência Internacional

Files in This Item:
File Description SizeFormat 
67182.pdfPowerTech_2005_Braga75.1 kBAdobe PDF    Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.