Utilize este identificador para referenciar este registo: https://hdl.handle.net/10216/93156
Registo completo
Campo DCValorIdioma
dc.creatorC. F. Sousa
dc.creatorR. Calçada
dc.creatorA. S. Neves
dc.date.accessioned2022-09-06T21:42:14Z-
dc.date.available2022-09-06T21:42:14Z-
dc.date.issued2008
dc.identifier.othersigarra:98043
dc.identifier.urihttps://hdl.handle.net/10216/93156-
dc.description.abstractFatigue verification doesn't govern the design of the majority of civil engineering structures, but, in the case of railway bridges (namely those constructed with prefabricated beams) fatigue needs to be taken into account because of the high value and the cyclic nature of the traffic actions. The main objective of the present paper is the identification of the critical points where fatigue verification is more severe than ultimate limit state verification, in the case of railway bridge decks constructed with precast "U" beams carrying heavy freight traffic.
dc.language.isoeng
dc.relation.ispartofLIFE-CYCLE CIVIL ENGINEERING
dc.rightsrestrictedAccess
dc.subjectEngenharia civil
dc.subjectCivil engineering
dc.titleFatigue life of precast decks of high speed railway bridges
dc.typeArtigo em Livro de Atas de Conferência Internacional
dc.contributor.uportoFaculdade de Engenharia
dc.identifier.doi10.1201/9780203885307.ch69
dc.identifier.authenticusP-004-41E
dc.subject.fosCiências da engenharia e tecnologias::Engenharia civil
dc.subject.fosEngineering and technology::Civil engineering
Aparece nas coleções:FEUP - Artigo em Livro de Atas de Conferência Internacional

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
98043.pdf
  Restricted Access
Artigo publicado138.06 kBAdobe PDFVer/Abrir


Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.