Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/176421
Author(s): Joana Gomes de Brito
Title: Integrated Program to Reduce Lead Time through Reduced Formulation Variability and Improved Planning
Issue Date: 2026-07-13
Subject: Engenharia mecânica
Mechanical engineering
Scientific areas: Ciências da engenharia e tecnologias::Engenharia mecânica
Engineering and technology::Mechanical engineering
URI: https://hdl.handle.net/10216/176421
Document Type: Dissertação
Rights: embargoedAccess
Embargo End Date: 2029-07-12
Appears in Collections:FEUP - Dissertação

Files in This Item:
File Description SizeFormat 
793442.pdf
  Restricted Access
Integrated Program to Reduce Lead Time through Reduced Formulation Variability and Improved Planning29.07 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.