Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/176421| Author(s): | Joana Gomes de Brito |
| Title: | Integrated Program to Reduce Lead Time through Reduced Formulation Variability and Improved Planning |
| Issue Date: | 2026-07-13 |
| Subject: | Engenharia mecânica Mechanical engineering |
| Scientific areas: | Ciências da engenharia e tecnologias::Engenharia mecânica Engineering and technology::Mechanical engineering |
| URI: | https://hdl.handle.net/10216/176421 |
| Document Type: | Dissertação |
| Rights: | embargoedAccess |
| Embargo End Date: | 2029-07-12 |
| Appears in Collections: | FEUP - Dissertação |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 793442.pdf Restricted Access | Integrated Program to Reduce Lead Time through Reduced Formulation Variability and Improved Planning | 29.07 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.