Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/176421
Full metadata record
DC FieldValueLanguage
dc.creatorJoana Gomes de Brito
dc.date.accessioned2026-08-27T01:32:12Z-
dc.date.available2026-08-27T01:32:12Z-
dc.date.issued2026-07-13
dc.date.submitted2026-08-07
dc.identifier.othersigarra:793442
dc.identifier.urihttps://hdl.handle.net/10216/176421-
dc.language.isoeng
dc.rightsembargoedAccess
dc.subjectEngenharia mecânica
dc.subjectMechanical engineering
dc.titleIntegrated Program to Reduce Lead Time through Reduced Formulation Variability and Improved Planning
dc.typeDissertação
dc.date.embargo2029-07-12
dc.contributor.uportoFaculdade de Engenharia
dc.subject.fosCiências da engenharia e tecnologias::Engenharia mecânica
dc.subject.fosEngineering and technology::Mechanical engineering
thesis.degree.disciplineMestrado em Engenharia Mecânica
thesis.degree.grantorFaculdade de Engenharia
thesis.degree.grantorUniversidade do Porto
thesis.degree.level1
rcaap.embargofctA presente dissertação foi desenvolvida em contexto empresarial e integra dados, metodologias, análises e conclusões que constituem informação sensível de caráter estratégico e comercial.
Appears in Collections:FEUP - Dissertação

Files in This Item:
File Description SizeFormat 
793442.pdf
  Restricted Access
Integrated Program to Reduce Lead Time through Reduced Formulation Variability and Improved Planning29.07 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.