Please use this identifier to cite or link to this item: http://hdl.handle.net/10216/15850
Author(s): Christian Almeder
Diego Klabjan
B. Almada-Lobo
Title: Lead time considerations for the multi-level capacitated lot-sizing problem
Issue Date: 2009
Description: The classical multi-level capacitated lot-sizing problem is often not suitable to correctly capture resource requirements and precedence relations. We tackle this issue by explicitly modeling these two aspects. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach to deliver more realistic and practically feasible results.Large-scale cases are solved by Benders, which has been enhanced in several novel ways.
Subject: Programação, Engenharia industrial, Outras ciências da engenharia e tecnologias
Programming, Industrial engineering, Other engineering and technologies
URI: http://hdl.handle.net/10216/15850
Document Type: Relatório Técnico
Rights: openAccess
License: https://creativecommons.org/licenses/by-nc/4.0/
Appears in Collections:FEUP - Relatório Técnico

Files in This Item:
File Description SizeFormat 
41236.pdf727.68 kBAdobe PDFThumbnail
View/Open


This item is licensed under a Creative Commons License Creative Commons