Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/15850| Author(s): | Christian Almeder Diego Klabjan B. Almada-Lobo |
| Title: | Lead time considerations for the multi-level capacitated lot-sizing problem |
| Issue Date: | 2009 |
| Description: | The classical multi-level capacitated lot-sizing problem is often not suitable to correctly capture resource requirements and precedence relations. We tackle this issue by explicitly modeling these two aspects. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach to deliver more realistic and practically feasible results.Large-scale cases are solved by Benders, which has been enhanced in several novel ways. |
| Subject: | Programação, Engenharia industrial, Outras ciências da engenharia e tecnologias Programming, Industrial engineering, Other engineering and technologies |
| Scientific areas: | Ciências da engenharia e tecnologias::Outras ciências da engenharia e tecnologias Engineering and technology::Other engineering and technologies |
| URI: | https://repositorio-aberto.up.pt/handle/10216/15850 |
| Document Type: | Relatório Técnico |
| Rights: | openAccess |
| License: | https://creativecommons.org/licenses/by-nc/4.0/ |
| Appears in Collections: | FEUP - Relatório Técnico |
This item is licensed under a Creative Commons License
