Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/11596
Full metadata record
DC FieldValueLanguage
dc.contributorLeachman, Robertpt_PT
dc.contributorUniversity of Californiapt_PT
dc.creatorGonçalves, José Fernandopt_PT
dc.date1987pt_PT
dc.date.accessioned2012-09-03T23:15:28Z-
dc.date.available2012-09-03T23:15:28Z-
dc.date.issued1987-
dc.identifieroai:digitool.fe.up.pt:12559pt_PT
dc.identifier.urihttp://hdl.handle.net/10216/11596-
dc.descriptionTese de doutoramento. Engineering. University of California. 1987pt_PT
dc.formatIV, 113 f., 30 cmpt_PT
dc.format.mimetypeapplication/pdfpt_PT
dc.format.mimetypeapplication/pdfpt_PT
dc.languageengpt_PT
dc.relationFEUPpt_PT
dc.relationSDIpt_PT
dc.relationRiFEUPpt_PT
dc.rightsopenAccesspt_PT
dc.subjectGestão de empresaspt_PT
dc.subjectGestão da produçãopt_PT
dc.subjectModelos matemáticospt_PT
dc.titleContinuous time analysis of production planning and scheduling modelspt_PT
dc.typeTesept_PT
dc.contributor.uportoFaculdade de Engenharia-
dc.identifier.doi10.34626/0yvy-kq83-
thesis.degree.grantorFaculdade de Engenharia-
thesis.degree.grantorUniversidade do Porto-
thesis.degree.level2-
dc.identifier.isnihttps://isni.org/isni/000000040392388X-
dc.identifier.rorhttps://ror.org/043pwc612-
Appears in Collections:FEUP - Tese

Files in This Item:
File Description SizeFormat 
Resumo.pdfResumo12.37 kBAdobe PDFThumbnail
View/Open
Texto integral.pdfTexto integral4.09 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.