Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/110151Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.creator | Ferreira, M. M. A. | |
| dc.creator | Ribeiro, AF | |
| dc.creator | Smirnov, GV | |
| dc.date.accessioned | 2022-09-16T04:57:10Z | - |
| dc.date.available | 2022-09-16T04:57:10Z | - |
| dc.date.issued | 2013 | |
| dc.identifier.other | sigarra:225963 | |
| dc.identifier.uri | https://hdl.handle.net/10216/110151 | - |
| dc.description.abstract | In this paper we consider a control problem for a cascade of hydro-electric power stations where some of the stations have reversible turbines. The objective of our work is to optimize the profit of power production satisfying restrictions on the water level in the reservoirs. We obtain sufficient conditions of optimality and illustrate them with a simple example. | |
| dc.language.iso | eng | |
| dc.relation.ispartof | AIP Conference Proceedings | |
| dc.rights | openAccess | |
| dc.title | Sufficient Conditions of Optimality for Control of Hydro-Electric Power Stations | |
| dc.type | Artigo em Livro de Atas de Conferência Internacional | |
| dc.contributor.uporto | Faculdade de Engenharia | |
| dc.identifier.doi | 10.1063/1.4825559 | |
| dc.identifier.authenticus | P-008-GR7 | |
| Appears in Collections: | FEUP - Artigo em Livro de Atas de Conferência Internacional | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 225963.pdf | This article may be downloaded for personal use only. Any other use requires prior permission of the author and AIP Publishing. The article may be found at https://doi.org/10.1063/1.4825559 | 123.43 kB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
