Browsing by Subject Programming, Industrial engineering, Other engineering and technologies
Showing results 1 to 1 of 1
| Issue Date | Title | Author(s) | Type |
|---|---|---|---|
| 2009 | Lead time considerations for the multi-level capacitated lot-sizing problem | Christian Almeder; Diego Klabjan; B. Almada-Lobo | Relatório Técnico |