Utilize este identificador para referenciar este registo: https://hdl.handle.net/10216/92386
Registo completo
Campo DCValorIdioma
dc.creatorAntónio Aroso Menezes
dc.creatorAlistair Clark
dc.creatorBernardo Almada-Lobo
dc.date.accessioned2025-11-13T13:01:44Z-
dc.date.available2025-11-13T13:01:44Z-
dc.date.issued2011
dc.identifier.issn1094-6136
dc.identifier.othersigarra:61368
dc.identifier.urihttps://hdl.handle.net/10216/92386-
dc.description.abstractIn production planning, sequence dependent setup times and costs are often incurred for switchovers from one product to another. When setup times and costs do not respect the triangular inequality, a situation may occur where the optimal solution includes more than one batch of the same product in a single period-in other words, at least one sub tour exists in the production sequence of that period. By allowing setup crossovers, flexibility is increased and better solutions can be found. In tight capacity conditions, or whenever setup times are significant, setup crossovers are needed to assure feasibility. We present the first linear mixed-integer programming extension for the capacitated lot-sizing and scheduling problem incorporating all the necessary features of sequence sub tours and setup crossovers. This formulation is more efficient than other well known lot-sizing and scheduling models.
dc.language.isoeng
dc.rightsrestrictedAccess
dc.titleCapacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
dc.typeArtigo em Revista Científica Internacional
dc.contributor.uportoFaculdade de Engenharia
dc.identifier.doi10.1007/s10951-010-0197-6
dc.identifier.authenticusP-002-ST3
Aparece nas coleções:FEUP - Artigo em Revista Científica Internacional

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
61368.pdf
  Restricted Access
239.45 kBAdobe PDFVer/Abrir


Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.