Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/173644
Full metadata record
DC FieldValueLanguage
dc.creatorJoão Rafael Alves de Sousa Pinto Oliveira
dc.date.accessioned2026-03-10T02:34:39Z-
dc.date.available2026-03-10T02:34:39Z-
dc.date.issued2026-02-20
dc.date.submitted2026-03-03
dc.identifier.othersigarra:766334
dc.identifier.urihttps://hdl.handle.net/10216/173644-
dc.language.isoeng
dc.rightsopenAccess
dc.subjectEngenharia electrotécnica, electrónica e informática
dc.subjectElectrical engineering, Electronic engineering, Information engineering
dc.titleOptimization of Production and Voltage Regulation of a Cluster of Hybrid Parks
dc.typeDissertação
dc.contributor.uportoFaculdade de Engenharia
dc.subject.fosCiências da engenharia e tecnologias::Engenharia electrotécnica, electrónica e informática
dc.subject.fosEngineering and technology::Electrical engineering, Electronic engineering, Information engineering
thesis.degree.disciplineMestrado em Engenharia Eletrotécnica e de Computadores
thesis.degree.grantorFaculdade de Engenharia
thesis.degree.grantorUniversidade do Porto
thesis.degree.level1
Appears in Collections:FEUP - Dissertação

Files in This Item:
File Description SizeFormat 
766334.pdfOptimization of Production and Voltage Regulation of a Cluster of Hybrid Parks5.97 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.