Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/169368| Author(s): | Arthur Victor M Van Onderbergen |
| Title: | Production planning under skill and operational constraints: developing a mathematical framework for the injection moulding department at Niko |
| Issue Date: | 2025-06-23 |
| Subject: | Outras ciências da engenharia e tecnologias Other engineering and technologies |
| Scientific areas: | Ciências da engenharia e tecnologias::Outras ciências da engenharia e tecnologias Engineering and technology::Other engineering and technologies |
| TID identifier: | 204109728 |
| URI: | https://hdl.handle.net/10216/169368 |
| Document Type: | Dissertação |
| Rights: | embargoedAccess |
| Embargo End Date: | 2030-06-22 |
| Appears in Collections: | FEUP - Dissertação |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 739896.pdf Restricted Access | Production planning under skill and operational constraints: developing a mathematical framework for the injection moulding department at Niko | 2.75 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.