Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/168855
Full metadata record
DC FieldValueLanguage
dc.creatorJoão Gil Correia da Silva Ferreira
dc.date.accessioned2026-01-26T04:42:32Z-
dc.date.available2026-01-26T04:42:32Z-
dc.date.issued2025-07-21
dc.date.submitted2025-07-28
dc.identifier.othersigarra:735645
dc.identifier.urihttps://hdl.handle.net/10216/168855-
dc.language.isoeng
dc.rightsembargoedAccess
dc.subjectEngenharia mecânica
dc.subjectMechanical engineering
dc.titleOptimizing Production and Delivery - An Integrated Multi-Facility Planning Approach
dc.typeDissertação
dc.date.embargo2028-07-20
dc.contributor.uportoFaculdade de Engenharia
dc.identifier.tid204114853
dc.subject.fosCiências da engenharia e tecnologias::Engenharia mecânica
dc.subject.fosEngineering and technology::Mechanical engineering
thesis.degree.disciplineMestrado em Engenharia Mecânica
thesis.degree.grantorFaculdade de Engenharia
thesis.degree.grantorUniversidade do Porto
thesis.degree.level1
rcaap.embargofctConfidencialidade dos clientes da empresa
Appears in Collections:FEUP - Dissertação

Files in This Item:
File Description SizeFormat 
735645.pdf
  Restricted Access
Optimizing Production and Delivery - An Integrated Multi-Facility Planning Approach2.33 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.