Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/165503| Author(s): | Alexandre Maria Mesquita Guimarães de Castro Lencastre |
| Title: | Improving Project Management and Manufacturing Flow Implementation in a Power Generator Factory: A Kaizen Approach |
| Issue Date: | 2025-02-06 |
| Subject: | Engenharia mecânica Mechanical engineering |
| Scientific areas: | Ciências da engenharia e tecnologias::Engenharia mecânica Engineering and technology::Mechanical engineering |
| DOI: | 10.34626/em0n-hf78 |
| TID identifier: | 204110041 |
| URI: | https://hdl.handle.net/10216/165503 |
| Document Type: | Dissertação |
| Rights: | embargoedAccess |
| Embargo End Date: | 2028-02-05 |
| Appears in Collections: | FEUP - Dissertação |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 711402.pdf Restricted Access | Improving Project Management and Manufacturing Flow Implementation in a Power Generator Factory: A Kaizen Approach | 5.7 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.