Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/165503
Author(s): Alexandre Maria Mesquita Guimarães de Castro Lencastre
Title: Improving Project Management and Manufacturing Flow Implementation in a Power Generator Factory: A Kaizen Approach
Issue Date: 2025-02-06
Subject: Engenharia mecânica
Mechanical engineering
Scientific areas: Ciências da engenharia e tecnologias::Engenharia mecânica
Engineering and technology::Mechanical engineering
DOI: 10.34626/em0n-hf78
TID identifier: 204110041
URI: https://hdl.handle.net/10216/165503
Document Type: Dissertação
Rights: embargoedAccess
Embargo End Date: 2028-02-05
Appears in Collections:FEUP - Dissertação

Files in This Item:
File Description SizeFormat 
711402.pdf
  Restricted Access
Improving Project Management and Manufacturing Flow Implementation in a Power Generator Factory: A Kaizen Approach5.7 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.