Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/162585
Author(s): David Tadeo Esquer Covarrubias
Title: LCA of Two Pipe Installation Methods: Open-Cut vs Tunnelling, for a Desalination Plant Scenario
Issue Date: 2024-10-11
Subject: Engenharia civil
Civil engineering
Scientific areas: Ciências da engenharia e tecnologias::Engenharia civil
Engineering and technology::Civil engineering
DOI: 10.34626/1afk-7w04
TID identifier: 203856910
URI: https://hdl.handle.net/10216/162585
Document Type: Dissertação
Rights: openAccess
Appears in Collections:FEUP - Dissertação

Files in This Item:
File Description SizeFormat 
694917.pdfLCA OF TWO PIPE INSTALLATION METHODS: OPEN-CUT VS TUNNELLING, FOR A DESALINATION PLANT SCENARIO5.15 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.