Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/162585| Author(s): | David Tadeo Esquer Covarrubias |
| Title: | LCA of Two Pipe Installation Methods: Open-Cut vs Tunnelling, for a Desalination Plant Scenario |
| Issue Date: | 2024-10-11 |
| Subject: | Engenharia civil Civil engineering |
| Scientific areas: | Ciências da engenharia e tecnologias::Engenharia civil Engineering and technology::Civil engineering |
| DOI: | 10.34626/1afk-7w04 |
| TID identifier: | 203856910 |
| URI: | https://hdl.handle.net/10216/162585 |
| Document Type: | Dissertação |
| Rights: | openAccess |
| Appears in Collections: | FEUP - Dissertação |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 694917.pdf | LCA OF TWO PIPE INSTALLATION METHODS: OPEN-CUT VS TUNNELLING, FOR A DESALINATION PLANT SCENARIO | 5.15 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
