Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/153461Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.creator | Pedro Sollari Allegro de Soveral Casal | |
| dc.date.accessioned | 2025-11-11T23:33:20Z | - |
| dc.date.available | 2025-11-11T23:33:20Z | - |
| dc.date.issued | 2023-10-31 | |
| dc.date.submitted | 2023-09-28 | |
| dc.identifier.other | sigarra:646821 | |
| dc.identifier.uri | https://hdl.handle.net/10216/153461 | - |
| dc.language.iso | eng | |
| dc.rights | openAccess | |
| dc.subject | Economia e gestão | |
| dc.subject | Economics and Business | |
| dc.title | Energy-Aware Job Shop Scheduling: Optimizing Production Efficiency through Machine Power Saving Strategies | |
| dc.type | Dissertação | |
| dc.contributor.uporto | Faculdade de Economia | |
| dc.identifier.doi | 10.34626/zpta-ew87 | |
| dc.identifier.tid | 203557140 | |
| dc.subject.fos | Ciências sociais::Economia e gestão | |
| dc.subject.fos | Social sciences::Economics and Business | |
| thesis.degree.discipline | Mestrado em Economia da Empresa e da Estratégia | |
| thesis.degree.grantor | Faculdade de Economia | |
| thesis.degree.grantor | Universidade do Porto | |
| thesis.degree.level | 1 | |
| Appears in Collections: | FEP - Dissertação | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 646821.pdf | Energy-Aware Job Shop Scheduling: Optimizing Production Efficiency through Machine Power Saving Strategies | 927.31 kB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
