Utilize este identificador para referenciar este registo: https://hdl.handle.net/10216/152124
Registo completo
Campo DCValorIdioma
dc.creatorRaquel Medeiros da Ponte
dc.date.accessioned2025-11-13T09:55:09Z-
dc.date.available2025-11-13T09:55:09Z-
dc.date.issued2023-07-18
dc.date.submitted2023-07-28
dc.identifier.othersigarra:636950
dc.identifier.urihttps://hdl.handle.net/10216/152124-
dc.language.isoeng
dc.rightsopenAccess
dc.subjectEngenharia electrotécnica, electrónica e informática
dc.subjectElectrical engineering, Electronic engineering, Information engineering
dc.titleOptimization of the new alarm system implemented on PowerStudio SCADA
dc.typeDissertação
dc.contributor.uportoFaculdade de Engenharia
dc.identifier.doi10.34626/bj13-jr33
dc.identifier.tid203426681
dc.subject.fosCiências da engenharia e tecnologias::Engenharia electrotécnica, electrónica e informática
dc.subject.fosEngineering and technology::Electrical engineering, Electronic engineering, Information engineering
thesis.degree.disciplineMestrado em Engenharia Eletrotécnica e de Computadores
thesis.degree.grantorFaculdade de Engenharia
thesis.degree.grantorUniversidade do Porto
thesis.degree.level1
Aparece nas coleções:FEUP - Dissertação

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
636950.pdfOptimization of the new alarm system implemented on PowerStudio SCADA25.05 MBAdobe PDFThumbnail
Ver/Abrir


Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.