Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/143463| Author(s): | Gonçalo Campos Carvalho Varela |
| Title: | Simulation of A Production Order Duration Using Digital Twins |
| Issue Date: | 2022-07-29 |
| Subject: | Engenharia mecânica Mechanical engineering |
| Scientific areas: | Ciências da engenharia e tecnologias::Engenharia mecânica Engineering and technology::Mechanical engineering |
| DOI: | 10.34626/hmej-ts56 |
| TID identifier: | 203166086 |
| URI: | https://hdl.handle.net/10216/143463 |
| Document Type: | Dissertação |
| Rights: | openAccess |
| Appears in Collections: | FEUP - Dissertação |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 574383.pdf | Simulation of a production order duration using Digital Twins | 4.54 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
