Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/142837
Full metadata record
DC FieldValueLanguage
dc.creatorRodrigo Guimarães e Castro
dc.date.accessioned2025-11-11T06:54:31Z-
dc.date.available2025-11-11T06:54:31Z-
dc.date.issued2022-07-20
dc.date.submitted2022-08-08
dc.identifier.othersigarra:572449
dc.identifier.urihttps://hdl.handle.net/10216/142837-
dc.language.isoeng
dc.rightsopenAccess
dc.subjectOutras ciências da engenharia e tecnologias
dc.subjectOther engineering and technologies
dc.titleMulti-Objective Job-Shop Planning and Scheduling for the Luxury Furniture Industry
dc.typeDissertação
dc.contributor.uportoFaculdade de Engenharia
dc.identifier.doi10.34626/3sbd-n697
dc.identifier.tid203171926
dc.subject.fosCiências da engenharia e tecnologias::Outras ciências da engenharia e tecnologias
dc.subject.fosEngineering and technology::Other engineering and technologies
thesis.degree.disciplineMestrado em Engenharia e Gestão Industrial
thesis.degree.grantorFaculdade de Engenharia
thesis.degree.grantorUniversidade do Porto
thesis.degree.level1
rcaap.embargofctDados sensíveis da empresa cliente estão presentes na dissertação
Appears in Collections:FEUP - Dissertação

Files in This Item:
File Description SizeFormat 
572449.pdfMulti-Objective Job-Shop Planning and Scheduling for the Luxury Furniture Industry3.92 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.