Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/137244| Author(s): | José Pedro Basso e Mota |
| Title: | Integrated Risk Management Method (IRMM) in the forestry sector |
| Issue Date: | 2021-10-12 |
| Subject: | Outras ciências da engenharia e tecnologias Other engineering and technologies |
| Scientific areas: | Ciências da engenharia e tecnologias::Outras ciências da engenharia e tecnologias Engineering and technology::Other engineering and technologies |
| DOI: | 10.34626/9m9s-cf75 |
| TID identifier: | 202827526 |
| URI: | https://hdl.handle.net/10216/137244 |
| Document Type: | Dissertação |
| Rights: | openAccess |
| Appears in Collections: | FEUP - Dissertação |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 511782.pdf | Integrated Risk Management Method (IRMM) in the forestry sector | 2.84 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
