Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/133695| Author(s): | André Filipe Félix da Silva Mendes Teixeira |
| Title: | Black-start Dynamic Requirements and Operation of Energy Storage Systems with High Wind penetration |
| Issue Date: | 2021-04-07 |
| Subject: | Engenharia electrotécnica, electrónica e informática Electrical engineering, Electronic engineering, Information engineering |
| Scientific areas: | Ciências da engenharia e tecnologias::Engenharia electrotécnica, electrónica e informática Engineering and technology::Electrical engineering, Electronic engineering, Information engineering |
| DOI: | 10.34626/fz1b-vp94 |
| TID identifier: | 202826970 |
| URI: | https://hdl.handle.net/10216/133695 |
| Document Type: | Dissertação |
| Rights: | restrictedAccess |
| Appears in Collections: | FEUP - Dissertação |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 463920.1.pdf Restricted Access | Black-start Dynamic Requirements and Operation of Energy Storage Systems with High Wind penetration | 2.36 MB | Adobe PDF | View/Open |
| 463920.pdf | Black-start Dynamic Requirements and Operation of Energy Storage Systems with High Wind penetration | 2.37 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
