Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/121188| Author(s): | Hélder Fernando da Silva Laureano |
| Title: | Consequências das Não Conformidades nos Tempos e Prazo de Obra |
| Issue Date: | 2019-07-08 |
| Subject: | Engenharia civil Civil engineering |
| Scientific areas: | Ciências da engenharia e tecnologias::Engenharia civil Engineering and technology::Civil engineering |
| DOI: | 10.34626/6cwk-cb77 |
| TID identifier: | 202392511 |
| URI: | https://hdl.handle.net/10216/121188 |
| Document Type: | Dissertação |
| Rights: | openAccess |
| Appears in Collections: | FEUP - Dissertação |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 342745.pdf | Consequências das Não Conformidades nos Tempos e Prazo de Obra | 11.29 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
