Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/110152
Full metadata record
DC FieldValueLanguage
dc.creatorBushenkov, VA
dc.creatorFerreira, M. M. A.
dc.creatorRibeiro, AF
dc.creatorSmirnov, GV
dc.date.accessioned2022-09-10T00:20:44Z-
dc.date.available2022-09-10T00:20:44Z-
dc.date.issued2016
dc.identifier.issn1935-0090
dc.identifier.othersigarra:225966
dc.identifier.urihttps://hdl.handle.net/10216/110152-
dc.description.abstractIn this work we analyze an optimal control problem for a system of two hydroelectric power stations in cascade withreversible turbines. The objective is to optimize the proft of power production while respecting the system's restrictions. Some of theserestrictions translate into state constraints and the cost function is nonconvex. This increases the complexity of the optimal controlproblem. The problem is solved numerically and two different approaches are adopted. These approaches focus on global optimizationtechniques (Chen-Burer algorithm) and on a projection estimation refnement method (PERmethod). PERmethod is used as a techniqueto reduce the dimension of the problem. Results and execution time of the two procedures are compared. (c) 2016 NSP Natural Sciences Publishing Cor.
dc.language.isoeng
dc.rightsopenAccess
dc.titleProblem of hydroelectric resources management: Numerical approach
dc.typeArtigo em Revista Científica Internacional
dc.contributor.uportoFaculdade de Engenharia
dc.identifier.doi10.18576/amis/100302
dc.identifier.authenticusP-00K-MM0
Appears in Collections:FEUP - Artigo em Revista Científica Internacional

Files in This Item:
File Description SizeFormat 
225966.pdfThis is a pre-copy-editing, author-produced pdf. Definitive publisher-authenticated version, available online at:220.63 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.