Please use this identifier to cite or link to this item:
https://hdl.handle.net/10216/108918| Author(s): | Jorge Manuel Gomes Barbosa Hamid Arabnejad |
| Title: | Maximizing the completion rate of concurrent scientific applications under time and budget constraints |
| Issue Date: | 2017-11-30 |
| Abstract: | In many domains of science, scientific applications are represented by workflows. In this paper, we introduce a resource management strategy to maximize the success rate of concurrent workflow applications constrained by individual deadline and budget values. The Multi-Workflow Deadline-Budget Scheduling (MW-DBS) algorithm can schedule multiple workflows that can arrive in the system at any time, with the aim of satisfying individual job requirements. MW-DBS produces schedules without performing optimizations but guarantees that the deadline and budget defined for each job are not exceeded. Experimental results show that our strategy increases the scheduling success rate of finding valid solutions. |
| Subject: | Engenharia de sistemas, Engenharia electrotécnica, electrónica e informática Systems engineering, Electrical engineering, Electronic engineering, Information engineering |
| Scientific areas: | Ciências da engenharia e tecnologias::Engenharia electrotécnica, electrónica e informática Engineering and technology::Electrical engineering, Electronic engineering, Information engineering |
| DOI: | 10.1016/j.jocs.2016.10.013 |
| URI: | https://hdl.handle.net/10216/108918 |
| Document Type: | Artigo em Revista Científica Internacional |
| Rights: | restrictedAccess |
| Appears in Collections: | FEUP - Artigo em Revista Científica Internacional |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 231703.pdf Restricted Access | Publicação | 1.07 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.