Please use this identifier to cite or link to this item: https://hdl.handle.net/10216/105791
Author(s): Tiago Filipe Gonçalves do Cabo
Title: Implementação de RCM-Reliability Centred Maintenance em equipamento novo: Caso de estudo
Issue Date: 2017-07-11
Subject: Engenharia mecânica
Mechanical engineering
Scientific areas: Ciências da engenharia e tecnologias::Engenharia mecânica
Engineering and technology::Mechanical engineering
DOI: 10.34626/196f-sz96
TID identifier: 201803623
URI: https://hdl.handle.net/10216/105791
Document Type: Dissertação
Rights: openAccess
Appears in Collections:FEUP - Dissertação

Files in This Item:
File Description SizeFormat 
202062.pdfImplementação de RCM-Reliability Centred Maintenance em equipamento novo: Caso de estudo3.02 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.