Utilize este identificador para referenciar este registo: https://hdl.handle.net/10216/102752
Registo completo
Campo DCValorIdioma
dc.creatorFrancisco Gonçalves Montenegro Chaves
dc.date.accessioned2025-11-04T22:18:11Z-
dc.date.available2025-11-04T22:18:11Z-
dc.date.issued2017-02-06
dc.date.submitted2017-03-17
dc.identifier.othersigarra:182221
dc.identifier.urihttps://hdl.handle.net/10216/102752-
dc.language.isoeng
dc.rightsopenAccess
dc.subjectEngenharia mecânica
dc.subjectMechanical engineering
dc.titleKaizen Productive Strategy in Different Scenarios - Gearbox and Hydraulic Components Manufacturing and Furniture Supply Chains
dc.typeDissertação
dc.contributor.uportoFaculdade de Engenharia
dc.identifier.doi10.34626/4bkj-wf54
dc.identifier.tid202590305
dc.subject.fosCiências da engenharia e tecnologias::Engenharia mecânica
dc.subject.fosEngineering and technology::Mechanical engineering
thesis.degree.disciplineMestrado Integrado em Engenharia Mecânica
thesis.degree.grantorFaculdade de Engenharia
thesis.degree.grantorUniversidade do Porto
thesis.degree.level1
Aparece nas coleções:FEUP - Dissertação

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
182221.pdfKaizen Productive Strategy in Different Scenarios - Gearbox and Hydraulic Components Manufacturing and Furniture Supply Chains86.23 MBAdobe PDFThumbnail
Ver/Abrir


Todos os registos no repositório estão protegidos por leis de copyright, com todos os direitos reservados.